On this page
A plumbing estimate template you can copy
Start with the problem in the customer's words, then what you found. A homeowner who called about a slow drain wants to see that you heard them before they read the lines.
Plumbing estimate
- From
- [Your business name], [phone], [license number if your state needs one]
- For
- [Customer name], [job address]
- Estimate number
- [P-214]
- Date
- [Today]. This price holds for [30 days].
- What you called about
- [Slow kitchen drain, water heater leaking, low pressure upstairs]
- What we found
- [Corroded trap, tank rusted through at the base, galvanized lines closing up]
| Work | Qty | Amount |
|---|---|---|
| [Labor: remove and replace, or clear and camera the line] | [hours] | [amount] |
| [Parts by name and size: 1-1/2 in. P-trap, 3/4 in. ball valve] | [count] | [amount] |
| [Fixture or equipment: make, model, size] | 1 | [amount] |
| [Permit and inspection, if your town needs one] | 1 | [amount] |
| [Haul away the old fixture or water heater] | 1 | [amount] |
| Total | [total] |
Not included: [drywall patching, tile, painting, or anything else you're leaving out].
If we open a wall or floor and find more, we stop, show you photos and price it before we go on.
Warranty: [labor warranty]. Parts and equipment: per the manufacturer.
To go ahead: sign below or reply yes, and we'll set a day. [Deposit terms]
How to write a plumbing estimate the customer says yes to
Most homeowners can't see inside a wall or under a slab. The estimate is the only picture they get of the job, so make it easy to follow.
- Say what you found first. A cracked supply line or a tank rusted at the base. Attach the photos.
- Name the parts. The size and type, not just "materials". It answers the call asking what they're paying for.
- Put the hidden work in writing. What happens if the wall is wet or the line is worse than it looked.
- Say what's not in it. Patching drywall and tile are the two biggest surprises after a plumbing job.
- Give it an end date. A price that holds for 30 days gets a decision sooner than one with no date.
Water heater and repipe estimates
Bigger jobs need a few more lines. On a water heater, name the size, fuel type and model, and list the venting, expansion tank, pan and code updates on their own lines so the customer can see why one quote is higher than another. On a repipe, say which lines you're replacing, what pipe you're using, how many days the water will be off, and how you'll patch the walls you open.
Hi [name], it's [your name] from [shop]. Your water heater is leaking at the base, so it's done. We'd put in a [size] [gas or electric] tank, add the expansion tank your town now asks for, and haul the old one away. [Amount], about [hours] hours, hot water back the same day. The full estimate is attached. Want us on [day]?
Flat rate or time and materials?
Both work on an estimate, as long as the customer can tell which one they're getting. A flat price is easier for a homeowner to say yes to, and it suits jobs you've done a hundred times, like a toilet rebuild or a faucet swap. Time and materials suits jobs where you can't see the problem yet, like a hidden leak. If you use it, give a range of hours and say you'll call before you go past it.

